Technical Note 5: Model Input Parameters. WTSM update 2013

Search in document library
Technical Note 5: Model Input Parameters. WTSM update 2013 preview
  • Published Date Tue 19 May 2015
All Tags

This technical note details the process used to update the input parameters into the Wellington transport models (WTSM – Wellington Transport Strategy Model & WPTM – Wellington Public Transport Model), as part of their 2013 update.

Updated October 21, 2021 at 3:31 PM