Technical note 12: Model Testing Report. WTSM update 2013
Search in document library
The 2011 Wellington Transport Strategy Model (WTSM) was updated to a 2013 base year by GWRC and TDG. The re-calibration of WTSM, involving the incorporation of updated heavy commercial vehicle (HCV) module within the model, is documented in a series of technical notes.