TN1 Network Preparation FINAL
Search in document libraryThis technical note (TN) outlines the procedure used in preparing the networks for the 2011 Wellington Transportation Strategic Model (WTSM) update and the Wellington Public Transport Model (WPTM). Unlike the 2006 WTSM update, where the previous (2001) model network was used as a base for the update, a new network has been developed for the 2011 update.