Hutt River Trail User Survey - Kennedy Good to Ewen Bridges - FINAL REPORT

Search in document library
Hutt River Trail User Survey - Kennedy Good to Ewen Bridges - FINAL REPORT  preview
  • Published Date Mon 01 Mar 2010
All Tags

This project surveyed users on the Kennedy Good Bridge (KGB) to Ewen Bridge section of the Hutt River Trail over a 5-week period from November to December 2009. This resulted in 638 completed surveys over the study period, which provides a robust sample for analysis with a margin for error of around +/- 4% at a 95% confidence interval.

The project has provided insight into user patterns, activities, frequency and demographics. The survey has also enabled Greater  Wellington Regional Council (GWRC) to gauge views on proposed flood management options in this stretch of the Hutt River

Updated August 8, 2022 at 2:20 PM