Western Corridor Transport Study - Summary of Draft Technical Report - Stage 1

Search in document library
  • Published Date Mon 18 Apr 2005

The draft technical report - Stage 1 details the work to date on
the Western Corridor Transportation Study and provides the
technical background for the Stage 2 consultation being held
in May 2005 with key stakeholders and the general public.

The report is a record of the key findings from the technical
work to date including assessment of the elements and
consideration of five corridor scenarios. A further technical
report will be produced in July taking into account the Stage
2 consultation and further technical work.