Review of objectives and limits for the Te-Awarua-o-Porirua Whaitua Implementation Programme
LWP were commissioned by Greater Wellington Regional Council to provide review comments on the logic and basis used to establish water quality objectives, limits and targets in the Te-Awarua-o-Porirua Whaitua…
alarm Published 18 Mar 2019 -
Porirua Whaitua Collaborative Modelling Project
The sole purpose of this report and the associated services performed by Jacobs is to develop an integrated hydrological and contaminant model for the Te Awarua-o-Porirua (TAoP) catchment, in accordance with…
alarm Published 15 Mar 2019 -
Porirua Whaitua Collaborative Modelling Project
PREPARED BY: James Blyth (Jacobs New Zealand Ltd.)
alarm Published 15 Mar 2019 -
-
7540_Agenda_Finance, Risk and Assurance Committee 19 March 2019, Order Paper.pdf
alarm Published 14 Mar 2019 -
Appendix G: Alternatives Assessment Report
This document provides a summary of the various alternatives that have been considered and assessed throughout the development of the Eastern Bays Shared Path project.
alarm Published 13 Mar 2019 -
Appendix L: Eastern Bays Transport Assessment
This document outlines the impacts, benefits, and mitigation measures on transport regarding the Eastern Bays Shared Path project.
alarm Published 13 Mar 2019 -
Appendix C2: Seagrass Survey
This document contains the assessment of a single survey, undertaken in December 2018, to confirm the presence and extent of seagrass at three locations to gain preliminary information on its…
alarm Published 08 Mar 2019 -
Air Discharge Monitoring 2019
This document contains the report which monitors the air discharge of the Resene factory extraction manufacturing facility in Upper Hutt, undertaken in January 2019. The objective of this report is…
alarm Published 07 Mar 2019