-
-
-
Regional Pest Management Plan 2019-2039 - Operational Plan 2022/23
The Regional Pest Management Plan 2019-2039 (RPMP) was prepared in accordance with the Biosecurity Act 1993 and became operative on the 2nd of July 2019.
This Operational Plan has been prepared…alarm Published 20 Dec 2022 -
Regional Pest Management Plan 2019-2039 - Operational Plan Report 2021/22
This document reports against the achievements and outcomes of GW’s biosecurity related activities. The work programme was set by the RPMP Operational Plan 2021/22 and aligns with the GW Annual…
alarm Published 20 Dec 2022 -
-
-
Duneland health monitoring data from 2017 to 2022
This report summarises the results of Greater Wellington’s (GW) programme monitoring the health of natural dunelands in the Wellington region. The programme surveys the management effectiveness, pressures and state of…
alarm Published 19 Dec 2022 -
Terrestrial ecology monitoring data from 2014 to 2022
This report summarises the results of Greater Wellington’s (GW) programme to monitor the health of terrestrial biodiversity in the Wellington region. The programme incorporates annual monitoring to measure the state…
alarm Published 19 Dec 2022 -
-