-
31 August 2016 to 20 January 2017
This document contains the decisions made under delegated authority on non-notified resource consent applications covering the period of 31 August to 20 January.
alarm Published 03 Feb 2017 -
Key Native Ecosystem Plan for Rewanui 2016-2019
The Key Native Ecosystem (KNE) Programme seeks to protect some of the best examples of ecosystem types in the Wellington region by managing, reducing, or removing threats to their values.…
alarm Published 01 Feb 2017 -
Key Native Ecosystem Plan for Te Horo Forest Remnants 2016-2019
The Key Native Ecosystem (KNE) Programme seeks to protect some of the best examples of ecosystem types in the Wellington region by managing, reducing, or removing threats to their values.…
alarm Published 01 Feb 2017 -
Wellington Metropolitan Rail : 2015/16 Annual Report
This report provides an overview of the performance of metro rail in Wellington in the financial year 1 July 2015 to 30 June 2016. Rolling stock and station assets are…
alarm Published 01 Feb 2017 -
Impact of Climate Change on Inflows to the Ruamāhanga Groundwater Management Zone
Prepared for GWRC by Christian Zammit, NIWA
alarm Published 01 Feb 2017 -
Appendix K: Draft Consent Conditions
This document contains the draft consent conditions for WGN140054.
alarm Published 31 Jan 2017 -
Appendix 11b: Featherston Wastewater Treatment Plant: Effects on Stream Ecology
This report assesses the potential effects of the discharge and future stages of the upgrade; it builds on
ecological surveys assessing the effects of the discharge during base flow conditions in…alarm Published 31 Jan 2017 -
Appendix B(a): Application Area and Land Ownership
This document contains further aerial maps, with legends included, of the areas within the consent application.
alarm Published 30 Jan 2017 -
Considering sense of place in freshwater planning, by Mark Newton and Jim Sinner
alarm Published 30 Jan 2017 -