-
Technical Note 8: WTSM 2013 Validation
This technical note documents the validation of the Wellington Transport Strategy Model (WTSM) as part of the 2013 update of the model. The validation process ensures that the WTSM is…
alarm Published 01 Jul 2015 -
Technical Note 9: WPTM 2013 Validation
This technical note documents the validation of the Wellington Public Transport Model (WPTM) as part of the 2013 update of the model. The validation process ensures that the WPTM is…
alarm Published 01 Jul 2015 -
Wairarapa Flow Regimes - Economic impact assessment of draft Plan changes
Link to report prepared in July 2015 for GWRC by LWP as part of the draft Natural Resources Plan process
alarm Published 01 Jul 2015 -
Ruamāhanga Whaitua Committee meeting/July 1 2015
WHEN: July 1 2015 4:00pm – 8:00pm
WHERE: Greytown Community Libraryalarm Published 01 Jul 2015