-
14 November 2015 to 31 December 2015
This document contains the decisions made under delegated authority on non-notified resource consent applications covering the period of 14 November to 31 December.
alarm Published 20 Jan 2016 -
Appendix 12: Preliminary Geotechnical Assessment
This document provides multidisciplinary and design consultancy services, as part of the initial technical investigation and high level concept design validation, for a combined residential & commercial development at Shelly Bay…
alarm Published 19 Jan 2016 -
S311 Beef and Lamb NZ
This document contains the Submission on the Proposed Natural Resources Plan from Beef and Lamb NZ.
alarm Published 18 Jan 2016 -
S121 CentrePort Limited
This document contains the Submission on the Proposed Natural Resources Plan from CentrePort Limited.
alarm Published 15 Jan 2016 -
S143 Maypole Environmental Limited
This document contains the Submission on the Proposed Natural Resources Plan from Maypole Environmental Limited.
alarm Published 15 Jan 2016 -
S75 Minister of Conservation
This document contains the Submission on the Proposed Natural Resources Plan from the Minister of Conservation.
alarm Published 15 Jan 2016 -
S55 The Oil Companies
This document contains the Submission on the Proposed Natural Resources Plan from The Oil Companies.
alarm Published 15 Jan 2016 -
S95 Phillip Walker
This document contains the Submission on the Proposed Natural Resources Plan from Phillip Walker.
alarm Published 15 Jan 2016 -
-