-
Greater Wellington Regional Council 10 Year Plan 2015-25 - Section 8, Audit report
INDEPENDENT AUDITOR’S REPORT ON GREATER WELLINGTON REGIONAL COUNCIL’S 2015/25 LONG-TERM PLAN
alarm Published 31 Dec 2016 -
Greater Wellington Regional Council 10 Year Plan 2015-25 - Section 9, Regional Councillors
The Greater Wellington Regional Council’s purpose is to enrich life in the Wellington Region by building resilient, connected and prosperous communities, protecting and enhancing our natural assets, and inspiring pride…
alarm Published 31 Dec 2016 -
-
-
-
Baring Head Project GWRC Concept Design Cost Plan (WT Partnership, 2015)
WT Partnership was engaged to prepare a concept design estimate for the redevelopment of the Baring Head Project in Wellington on behalf of Greater Wellington Regional Council.
The majority of work…alarm Published 18 Dec 2015 -
Concept Plan
This document contains the aerial map of the application area and coverage.
There is no digital version of this document available, but you can get in touch with publications@gw.govt.nz to get a copy of the document.
alarm Published 14 Dec 2015 -
-
-
Revised Roading Layout Plan
This document contains the revised roading layout plan for the application area.
There is no digital version of this document available, but you can get in touch with publications@gw.govt.nz to get a copy of the document.
alarm Published 11 Dec 2015