Investigation into stormwater contamination from the Exide Technologies reprocessing plant (51-57 Waione St, Petone)

Search in document library
  • Published Date Tue 26 Jul 2005

This report describes investigations into environmental incidents at the
Exide Technologies plant at Petone in 2004. These incidents resulted in
the heavy metal contamination of surfaces and stormwater around the
Exide site, some of which entered the stormwater network, resulting in
significant contamination (notably lead and antimony) of sediments and
water in the nearby Te Mome Stream.
Updated December 7, 2022 at 12:36 AM