Te Awarua-o-Porirua Harbour catchment turbidity monitoring Results of continuous turbidity monitoring 2014/15
Search in document library
: This report summarises the key results of continuous turbidity monitoring in three subcatchments of the Te Awarua-o-Porirua Harbour between July 2014 and June 2015. Annual and event-based sediment loads and yields were calculated for these subcatchments for the full monitoring period to date (20132015), including the contribution of the May 2015 floods.